Skip to main content
#
Loading Dock Supply

credit cards
9 Stocking
Locations

BBB Logo

Pit Leveler Pan Form

Pit Leveler Pan Form

A pit leveler pan form is a permanent steel framework used to cast an accurate, square concrete pit for mechanical and hydraulic dock levelers. The form is positioned, squared, and braced on the pit floor, and the concrete pit walls are poured directly around it, leaving a clean steel edge embedded in the concrete. Forms scale to accommodate 6', 6'6", and 7' wide levelers in 6', 8', and 10' lengths, achieving required pit depths of 20" or 24".

Features

  • All steel construction
  • Three-panel framework with front curb angle
  • Bolt-together assembly
  • Optional punchout for hydraulic units

A bolt-together steel pit pan form, three panels and curb angle, for mechanical and hydraulic pit levelers.

Pit Leveler Pan Form: Three Steel Panels Bolted Together

Find Your Pan Form

Leveler Widths6' to 7' wide6', 6'6" and 7'
Leveler Lengths6' to 10'6', 8' and 10'
Pit Depth20" or 24"24" for 10' long levelers
ConstructionBolt-together steelThree panels and the front curb angle

Pit Pan Form Pricing

Pit Leveler Pan form Dimensions and Pricing
In brief: pan forms and curb angle kits

A pit leveler pan form comes 6', 6'6" and 7' wide and 6', 8' and 10' long, 20" or 24" deep for 6' and 8' long levelers and 24" deep for 10'. Pan form dimension A, the pit width, is 74" for a 6' wide leveler, 80" for a 6'6" wide leveler and 85" for a 7' wide leveler; dimension B, the pit length, is 63" for a 6' long leveler, 87" for an 8' long leveler and 111" for a 10' long leveler; the pit is 20" or 24" deep at the front (D) and 19-1/2" or 23-1/2" at the rear (C), a 1/2" fall to the front. Pan forms ship at 215 lb for the 6' x 6' x 20", 245 lb for the 6' x 6' x 24", 255 lb for the 6' x 8' x 20", 295 lb for the 6' x 8' x 24", 325 lb for the 6' x 10' x 24", 285 lb for the 6'6" x 8' x 20", 305 lb for the 6'6" x 8' x 24", 335 lb for the 6'6" x 10' x 24", 230 lb for the 7' x 6' x 20", 260 lb for the 7' x 6' x 24", 270 lb for the 7' x 8' x 20", 310 lb for the 7' x 8' x 24" and 345 lb for the 7' x 10' x 24". A pit curb angle kit, six pieces, comes 6', 6'6" and 7' wide and 6', 8' and 10' long and ships at 140 lb for the 6' x 6', 160 lb for the 6' x 8', 180 lb for the 6' x 10', 145 lb for the 6'6" x 6', 165 lb for the 6'6" x 8', 185 lb for the 6'6" x 10', 150 lb for the 7' x 6', 170 lb for the 7' x 8' and 190 lb for the 7' x 10'.

Pit Leveler Pit Width
(A)
Pit Length
(B)
Rear Depth
(C)
Front Depth
(D)
Pan Form Curb Angle Kit
6' Wide x 6' Long 74" 63" 19-1/2" 20" Add to Quote Add to Quote
6' Wide x 6' Long 74" 63" 23-1/2" 24" Add to Quote Add to Quote
6' Wide x 8' Long 74" 87" 19-1/2" 20" Add to Quote Add to Quote
6' Wide x 8' Long 74" 87" 23-1/2" 24" Add to Quote Add to Quote
6' Wide x 10' Long 74" 111" 23-1/2" 24" Add to Quote Add to Quote
6'6" Wide x 6' Long 80" 63" 19-1/2" 20" Add to Quote
6'6" Wide x 8' Long 80" 87" 19-1/2" 20" Add to Quote Add to Quote
6'6" Wide x 8' Long 80" 87" 23-1/2" 24" Add to Quote Add to Quote
6'6" Wide x 10' Long 80" 111" 23-1/2" 24" Add to Quote Add to Quote
7' Wide x 6' Long 85" 63" 19-1/2" 20" Add to Quote Add to Quote
7' Wide x 6' Long 85" 63" 23-1/2" 24" Add to Quote Add to Quote
7' Wide x 8' Long 85" 87" 19-1/2" 20" Add to Quote Add to Quote
7' Wide x 8' Long 85" 87" 23-1/2" 24" Add to Quote Add to Quote
7' Wide x 10' Long 85" 111" 23-1/2" 24" Add to Quote Add to Quote
Pit Leveler Pan Form Drawing Showing Dimensions A, B, C And D
Pit Leveler Pan Form Section Drawing

Have Questions? Ask a Pit Leveler Specialist

Call 1-800-741-1258

Installation - Pit Pan Form

Pit Pan Form Kit - Installation Instructions

  1. Opening. Leave the opening in the foundation wall 12” wider than the finished pit width (Dim. A): a 74” pit takes an 86” opening.
  2. Pit floor. Pour your pit floor at least 6” wider than the finished pit width (Dim. A) and 3” longer than the finished length including the foundation wall (Dim. B). The slab should be at least 8” thick and slope 1/2" from back to front. If your kit has a front curb angle ensure it's cast in place at the center of the opening.
  3. Set up. Once the floor has cured, bolt or weld the pan form together, placed centered on the leveler pad. Assembled the angles will be at the top and front of the dock pit. If you are installing a hydraulic unit ensure you have confirmed placement of your conduit before proceeding.
  4. Square and brace. Check the form to ensure it is square and plumb, the front width matching the rear; remember to measure the top and bottom. Brace across the top at the middle and at the front with 2 x 4s, and nail 2 x 4 cleats to the pit floor on the outside of the form, or drill the bottom flange and nail the form down.
  5. Bulkhead. Board off the gap between each side panel and the edge of the wall opening, flush with the dock face, braced against the pour.
  6. Pour. Add concrete slowly and watch for shifting of the pan form. Remember the minimum wall width is 6" to 8" around the form. Do not use more concrete than normal for pit walls, and do not pour too fast.
  7. Strip. Remove the braces, cleats and bulkheads once the concrete has hardened/cured. The leveler is set and installed to its maker’s instructions after the concrete has cured.

Diagram Showing Standard Dimensions For Pit Pan Installation.
Pit pan installation dimensions
Diagram Showing Extended Dimensions And Considerations For Pit Pan Installation.
Extended pit pan dimensions

Check before you pour

Always verify the assembled form's physical width, length, and depth directly against your specific dock leveler's engineering pit drawing before casting concrete.

Pit Leveler Pan Form FAQ

What size pan form do I need?

Match the pan form to the pit leveler's width and length: a 6' x 8' leveler takes a 6' x 8' pan form, which forms a 74" x 87" pit. Pan forms come 6', 6'6" and 7' wide and 6', 8' and 10' long.

Do I need a 20" or 24" deep pan form?

Standard 6' and 8' long forms are manufactured in both 20" and 24" depths; 10' long forms are exclusively 24" deep. Always refer to your leveler's dimensional pit drawing to confirm the required depth.

What is the difference between a pan form and a curb angle kit?

Both give the pit a steel edge. The pan form is set in place and the concrete is poured around it, so it stays as the pit walls, and it includes the front curb angle. The curb angle kit is for a pit poured with removable wood or steel forms: its six angles are cast into the pit edges, protect the concrete, and give a point for welding and a place to fasten a brush seal.

Is the pan form part of the dock leveler?

No. The pan form acts strictly as the perimeter for the concrete pit. The Pit Leveler is purchased and installed as a separate unit once the pit concrete cures.

Do pan forms work with hydraulic pit levelers?

Yes. Pan forms support both mechanical and hydraulic levelers. Hydraulic units use the optional punchout.